Burullus Power Plant 4800 MW

Project brief : The Project Consists of 

  • Eight (8) Siemens Combustion Turbine Generators (CTGs) Frame (H), Gas Fired Turbine Generator Equipment Package with all required Balance of Plant Systems.
  • Eight (8) Heat Recovery Steam Generators (HRSGs) NEM, Benson type with all required Balance of Plant Systems.
  • Four (4) Siemens Steam Turbine Generators (STGs) with all required Balance of Plant Systems.
  • Four (4) Water Cooled Condensers with all required Balance of Plant Systems.
  • Four (4) Cooling Towers with all required Balance of Plant Systems.
  • The Plant utilizes Seawater as its Raw Water Source. The Plant is planned to be operated by Fuel Gas only. Two CTGs have the Capability to run on Light Fuel Oil. Power generated will be stepped up through main Transformers and fed to the Utility 500 kV Grid, via a Gas-insulated Switchgear (GIS) Switchyard.” 

Specfications

Client SIEMENS
Contractor IPSG
Category Civil Engineering
Country Egypt
Scope of work Design, rent and supervision for access scaffolding using Cup-Lock system
System Used Cup-Lock
  • Phone: (+202) 25255814
    Fax: (+202) 25255824

  • 9 El-Diplomasien St. , Othman Towers, Nile Courniche , Maadi , Cairo , Egypt.

About Us

Acrow For Integrated Construction Services (AICS) is a leading Egyptian company in the field of design, renting and erection for Formwork and Scaffolding systems.

© Copyright 2024 Aics by Edex